Customization: | Available |
---|---|
Power Supply: | Solar |
Color Temperature: | >5000K |
Still deciding? Get samples of US$ 328/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model NO. RYGH-FX-100W | |
LED Power | 100W |
Voltage | DC 12V |
LED Chip | Bridgelux 3030 |
Lumens | 170lm/w |
Color Temperature | 2700-6500K |
Solar Panel | 18V 100W(Imported Monocrystalline Silicon) |
Battery | (614.4WH = 12.8V 48Ah ) 100% New A1 Level LifePO4 Battery |
Charge time | 6 hours (Strong sunshine) |
Discharge time | 12 rainy/cloudy days |
Size | 1078*385*108mm |
Beam Angle | 140 Degrees Optional |
Mounting height | 8-10M |
Materials | Aluminum |
Control Method | Timing & Light Control, Remote, Microwave Sensor |
Operating Temperature | (- 30 ~ + 70 ) Degrees Celsius |
Warranty | 3 years |
IP Rating | IP65 |
Certificate | CE RoHS |
Application | Road, Packing Lot, Garden, Square, Pathway, Yard, Public Area, Highway, etc |
Remarks | We promise using 100% New A1 Level 12.8V LifePO4 Battery, and all raw materials are best we are using |
Q1:What is the warranty for your lights?
A1:For the lights,we have 3 years warranty, some products 5 years warranty.
Q2:How do you ensure the quality?
A2: We get three QC processes:1.For raw materials;2.During the half of production; 3.Final QC test one by one after aging 12 hours.
Q3:How to do if any quality problems on your side in the warranty time?
A3: First, take pictures or videos as proof and send to us.We will replace new ones for free.
Q4:OEM OR ODM accepted?
A4:Yes,we can do OEM & ODM,logo on the light or package both are available.
Q5: How many days will samples be finished?And how about the mass production?
A5: Generally 1-7 days for samples making. The leading time of mass production will depend on the quantity.
Q6:What is your trade assurance?
A6:100% product quality protection 100% product on time shipment protection 100% payment protection for your covered amount.