Customization: | Available |
---|---|
Color Temperature: | Cool White |
Lamp Body Material: | Aluminum |
Still deciding? Get samples of US$ 206.45/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model NO. RYGH-LSL-G400W | |
Wattage | 400W |
Voltage | AC 85-305V |
Certificate | CE RoHS |
Luminance Flux | 170lm/w |
Color Temperature | 2700-6500K |
LED Type | SMD 5050 |
Chip Brand | Lum-ileds/Smalite |
LED Driver | Inventronics |
Size | D384*H548mm |
Beam Angle | 10/25/45/60 Degrees Optional |
CRI | 70Ra |
Power Factor | >0.95 |
Storage Temperature | (- 20 ~ + 65 ) Degrees Celsius |
Operating Temperature | (- 40 ~ + 65 ) Degrees Celsius |
Warranty | 5 years |
Certificate | CE RoHS |
Application | Airport, Football, Gym, Parking Lot, Square, Gym, Sports Stadiums, etc |
In sports lighting, emitting upward light is likely to cause discomfort in other areas. The special design of the anti glared
shield can better control the excess light scattered upwards, achieve the effect of anti-glare, and increase the effective light of the sports field.
Q1:What is the warranty for your lights?
A1:For the lights,we have 3 years warranty, some products 5 years warranty.
Q2:How do you ensure the quality?
A2: We get three QC processes:1.For raw materials;2.During the half of production; 3.Final QC test one by one after aging 12 hours.
Q3:How to do if any quality problems on your side in the warranty time?
A3: First, take pictures or videos as proof and send to us.We will replace new ones for free.
Q4:OEM OR ODM accepted?
A4:Yes,we can do OEM & ODM,logo on the light or package both are available.
Q5: How many days will samples be finished?And how about the mass production?
A5: Generally 1-7 days for samples making. The leading time of mass production will depend on the quantity.
Q6:What is your trade assurance?
A6:100% product quality protection 100% product on time shipment protection 100% payment protection for your covered amount.