Customization: | Available |
---|---|
Color Temperature: | Pure White |
Lamp Body Material: | Aluminum |
Still deciding? Get samples of US$ 390.67/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
M1 LED Stadium Light Specifications
Features:
Product specifications
Part No. | M1-480W-B | M1-720W-B | M1-960W-B | M1-1200W-B | M1-1500W-B |
Modules | 2 | 3 | 4 | 5 | 6 |
Power | 480W | 720W | 960W | 1200W | 1500W |
Light efficiency | 150lm/w | 150lm/w | 150lm/w | 150lm/w | 150lm/w |
Lumen | 72000lm | 108000lm | 144000lm | 180000lm | 225000lm |
Dimension | 580.6*353*180mm | 590.6*548.8*195mm | 692.8*590.6*195mm | 836.8*590.6*195mm | 980.8*590.6*195mm |
No.of chips | 192 pcs | 288 pcs | 384 pcs | 480 pcs | 576 pcs |
Part No. | Product size | Carton Size | N.W. | G.W. |
M1-480W-B | 580.6*353*180mm | 603 x 383 x 243mm | 8.8kg | 9.5kg |
M1-720W-B | 590.6*548.8*195mm | 641 x 599 x 243mm | 13.8kg | 14.6kg |
M1-960W-B | 692.8*590.6*195mm | 743 x 641 x 243mm | 16.6kg | 17.5kg |
M1-1200W-B | 836.8*590.6*195mm | 887 x 641 x 243mm | 19.5kg | 20.8kg |
M1-1500W-B | 980.8*590.6*195mm | 1031 x 641 x 243mm | 22.3kg | 23.5kg |
Environment Requirement
Working Temperature:-40~+65ºC
Storage Temperature:-40~+75ºC
Working Humidity:0%~85%
Storage Humidity:0%~90%
Application:
It can be widely applied in High pole lighting, golf course lighting, road lighting, floodlight lighting, industrial lighting, tunnel lighting, airport lighting, golf course lighting, shipyard lighting, dock Lighting
Warning
1. Please install the lamp according to the installation to avoid dropping and electric shock.
2. Don't exchange the lamp as will to avoid dropping ,electric shock and damage of the lamp.
3. Working voltage is not to be exceeded AC100-305V 50/60Hz
Attention
1. Don't install the lamp to non-stable place.
2. Installed by qualified electrician.
3. Switch off the switch box and contact certified electrician if the lamp works abnormally
Warranty
5-year warranty since the date of purchase is offered for all LED flood Lights.
Warranty Terms
1. Under the terms of this warranty, if the product has a failure occurring under normal usage within warranty period, RYGH will provide free maintenance service based on the proof-documents and invoice (copy) of failure product.
2. RYGH will not provide paid maintenance service under conditions within warranty.
a. Failure or damage due to force majeure.
b. Failure or damage due to transport or unloading.
c. Failure or damage due to incorrectly usage or fail to comply with the User's Guide and Caution.
d. Failure or damage due to demolition, repair, alteration without Manufacturer's authorization.
3. Please deliver the failure product by original packing for maintenance service, RYGH will not be responsible for any failure or damage in transportation if customer uses non-original packing or improper packing.
4. RYGH reserves the right for final explanation of aforesaid terms.
Caution: RYGH will not be responsible for any other failure or damage by incorrect usage.
Q1:What is the warranty for your lights?
A1:For the lights,we have 3 years warranty, some products 5 years warranty.
Q2:How do you ensure the quality?
A2: We get three QC processes:1.For raw materials;2.During the half of production; 3.Final QC test one by one after aging 12 hours.
Q3:How to do if any quality problems on your side in the warranty time?
A3: First, take pictures or videos as proof and send to us.We will replace new ones for free.
Q4:OEM OR ODM accepted?
A4:Yes,we can do OEM & ODM,logo on the light or package both are available.
Q5: How many days will samples be finished?And how about the mass production?
A5: Generally 1-7 days for samples making. The leading time of mass production will depend on the quantity.
Q6:What is your trade assurance?
A6:100% product quality protection 100% product on time shipment protection 100% payment protection for your covered amount.